header-phone-logo

24/7 Emergency Service: Milwaukee: 414-771-5400 Racine/Kenosha: 282-886-3742

CASE STUDY:

Glen Rieder

Design/Build
New Construction
Power & Lighting

General Contractor: Berghammer Construction

Project Size: 118,140 sq. ft.

Location: West Allis, WI

Challenge: Roman Electric was hired to provide underground feeds for both line voltage and low voltage to over 200 pieces of equipment. Stub-up locations needed to be within an inch of their designated locations.

Solution: Through the use of CAD and a Trimble Total Station, Roman Electric hit the mark on every conduit stub-up.

"Roman Electric was pivotal to the success of this job. They were the first and last subcontractor on site and stayed on schedule to help the client prevent any lost production time."

John Pszonak, Vice President, Berghammer Construction Corp.