General Contractor: CD Smith

Project Size: 310 units

Location: Milwaukee, WI

Challenge: 7seventy7 was one of the largest projects in Roman's history, requiring design/build services for electrical low voltage and audio/visual components and installation in a building with very few drywall ceilings.

Solution: Turning to our experience on other massive projects, we tackled the design/build challenges and used a high-tech laser positioning system to embed conduit directly into the concrete.

"Roman was an excellent contractor. From the beginning of the design, Phil Rose was instrumental in putting together a great package at a great price. We felt like they were always part of our team throughout the construction. This is the first time we worked with them on a project of this size. It was good to see the horsepower they have and what they're able to produce."

Rich Severson, CD Smith