CASE STUDY:

Christian Education Leadership Academy

Design/Build
Institutional
Low Voltage Systems
New Construction
Power & Lighting

General Contractor: Catalyst Construction

Project Size: 178,992 square feet

Location: Pewaukee, WI

Challenge: Roman was asked to complete a high-end design/build educational facility project on an exceptionally fast schedule.

Solution: To avoid using light fixtures that require long lead times, we helped incorporate light coves into the architectural design and used high-output LED light tape to keep the project on schedule. This also accomplished the owner’s request to create well-lit spaces that accentuated the building’s high-end finishes without visible light fixtures. Even in 40-foot high atrium spaces, the ⅜” LED light tape provided exceptional lighting while maximizing energy efficiency.