CASE STUDY:
Design/Build
New Construction
Power & Lighting
Berghammer Construction
118,140 sq. ft.
West Allis, WI
Roman Electric was hired to provide underground feeds for both line voltage and low voltage to over 200 pieces of equipment. Stub-up locations needed to be within an inch of their designated locations.
Through the use of CAD and a Trimble Total Station, Roman Electric hit the mark on every conduit stub-up.
John Pszonak, Vice President of Construction, Berghammer Construction Corp.