24/7 Emergency Service

PROJECTS

Roman Electric | Ascension Cardio Vascular Institute
Matt PrinceVP of Operations, Riley Construction

We've been working with Roman Electric at the hospital for a lot of years. They always do a good job and always come through for us and for the client.

Matt Prince, VP of Operations, Riley Construction

Ascension Cardio Vascular Institute

The Ascension Cardio Vascular Institute (CVI) in Mt. Pleasant, Wisconsin, is a 160,000 sq. ft. state-of-the-art facility that consolidates cardiac medical and surgical units previously dispersed across the campus. Designed to serve as a premier destination for cardiac care in southeastern Wisconsin, the CVI integrates advanced technology to enhance patient outcomes and streamline cardiovascular services.

Challenge

This multi-story, multidisciplinary hospital required the installation, programming, integration, and testing of a wide array of complex systems. The project’s scope demanded meticulous coordination to ensure seamless integration of high-tech equipment and infrastructure within a functioning healthcare environment.

Solution

Roman Electric served as the electrical contractor for the CVI project, providing comprehensive services including power and lighting installations, low voltage systems, and new construction support. The team maintained close communication and coordination with both their subcontractors and those hired directly by the hospital, ensuring efficient project execution and adherence to the facility’s high standards for technological integration.

General Contractor :

Riley Construction

Project Size :

160,000 sq. ft.

Location :

Mt. Pleasant, WI

Low Voltage Systems
New Construction
Power & Lighting