Kenall Manufacturing Project

Roman Electric conducted a comprehensive assessment of Kenall’s existing power requirements to design a robust distribution system for the new facility. This system was tailored to support current manufacturing processes and provide scalability for future equipment and technological advancements. The project encompassed design/build services, energy-efficient solutions, low voltage systems, and comprehensive power and lighting installations, ensuring the new Kenosha facility operates efficiently and is well-prepared for future growth.

Challenge

The primary challenge was to transition Kenall’s existing manufacturing plant to the new Kenosha facility while designing an electrical infrastructure capable of meeting both current operational needs and accommodating future expansions.

Solution

Roman Electric conducted a comprehensive assessment of Kenall’s existing power requirements to design a robust distribution system for the new facility. This system was tailored to support current manufacturing processes and provide scalability for future equipment and technological advancements. The project encompassed design/build services, energy-efficient solutions, low voltage systems, and comprehensive power and lighting installations, ensuring the new Kenosha facility operates efficiently and is well-prepared for future growth.

General Contractor :

General Alston Construction

Project Size :

353,890 sq. ft.

Location :

Kenosha, WI

Design/Build
Energy Efficiency
Low Voltage Systems
New Construction
Power & Lighting