Set the Charging Target Before Choosing the Hardware
Work out how much energy each vehicle must recover before it leaves again. A car parked through an office shift gives Level 2 charging several hours to work. A delivery vehicle returning between routes may have a much shorter window, making DC fast charging worth evaluating.
Port count needs a separate decision. Sharing a charger between employees requires a workable arrangement for moving vehicles. If nobody can leave their shift to switch spaces, the parking plan needs to account for that.
For fleet charging, send the vehicle models together with their usual return and departure times. The equipment must suit the vehicles’ connectors and charging limits. Buying a higher-output charger only helps when the vehicle can accept that power.
What Happens When Every Vehicle Plugs In?
Several chargers can put a substantial new load on a building that already runs production equipment, refrigeration or heating systems. The assessment needs to establish how those demands overlap.
Electrical Capacity
An electrical panel with room for another breaker does not answer that question. Available service capacity, feeder capacity, existing demand and proposed charging loads all need review. Roman Electric’s feasibility studies address the electrical system and the upgrades a project may require.
EV Charging Load Management
EV charging load management can divide a defined power allowance between connected vehicles. Before choosing it, check that the reduced charging rates still leave vehicles ready on time.
Illustrative fleet calculation: Six vehicles needing 24 kWh each require 144 kWh in total. Across an eight-hour window, that equals an average of 18 kW delivered to their batteries. Actual electrical sizing must allow for charging losses, and the schedule must accommodate each vehicle’s charging limits and availability.
Walk the Route From the Electrical Room to the Parking Bays
Check the cable route.
The charger location affects much more than cable length. A route crossing a loading entrance creates different construction requirements from one running beside the building. Existing pavement, underground services and the position of distribution equipment can change the amount of excavation and restoration needed.
Coordinate with the facilities team.
Bring the facilities or property-management team into this discussion. They can identify delivery routes that need to remain clear and the hours when a power interruption would disrupt business activity.
Plan for winter access.
In Wisconsin, the winter parking arrangement matters too. Identify snow-storage areas and plow routes before placing pedestals. Check that drivers can reach charging connectors without stretching cables across pedestrian routes.
Confirm utility dependencies.
If additional utility capacity or metering is needed, establish that dependency before committing to a charger activation date. Equipment delivery, utility work and site construction may follow different schedules.
Know What the Installation Price Includes
A price per charger leaves too much room for assumptions. Compare the work included in each proposal, particularly the items that continue beyond the electrical connection.
| Item in the proposal | Detail to settle before approval |
|---|---|
| Charging equipment (EVSE) | Model, number of ports, configured output, connector compatibility and responsibility for purchasing the units. |
| Electrical work | New circuits and cable routes, plus any changes to panels, feeders, switchgear or the incoming service. |
| Groundwork and parking | Excavation, mounting bases, protective posts, pavement repairs and parking markings, with a contractor assigned to each task. |
| Approvals and utility work | Applicable permit and inspection responsibilities, utility charges and costs still carried as allowances. |
| Activation | Complete the required commissioning, connect the charging network, establish account ownership and test the stations before opening them to drivers. |
Ask for future-phase work to be priced separately. Installing spare conduit during excavation may be useful; buying electrical equipment for an uncertain expansion needs a different budget decision.
Allow for ongoing electricity, software and maintenance costs. Your utility rate may also include demand charges. Before offering charging, check the Wisconsin Department of Revenue’s EV guidance: free access and private fleet use can still carry charging-tax obligations. Confirm any incentive directly with the program administrator before treating it as committed funding.
Why Choose Roman Electric?
Capacity Assessment and Installation
A capacity problem discovered during planning can change the whole installation. Roman Electric can assess electrical capacity, upgrade the service where needed and install EV chargers, allowing the proposal to cover the work required to supply the charging bays.
Design-Build Coordination
For new buildings and renovations, Roman’s in-house electrical engineers and project managers work on Design-Build projects. Our commercial construction team can coordinate charging-related electrical work with the other trades.
Ongoing Maintenance Support
Maintenance is also part of Roman’s commercial EV offering. Ask about the service arrangement for your proposed equipment and review our commercial electrical service and maintenance capabilities when planning ongoing facility support.
Agree on What “Ready to Use” Means
The completion checks should reflect how the chargers will be used. For employee-only charging, that includes starting a session with the intended access credentials. For paid customer charging, payment processing belongs in the agreed checks. Configured power limits also need verification.
Someone at the property needs control of the administrator account and access to usage records. Before selecting networked equipment, ask what happens to charging and access controls if the internet connection drops.
Handover should leave the facility manager with a clear route for getting help. Power-supply faults, damaged equipment and software errors may each require a different support team. Record those contacts with the warranty details, and assign any manufacturer-required commissioning before setting the completion date.
Questions Before Booking Commercial EV Charger Installation
Can we purchase the chargers before requesting installation?
Send the proposed make and model before ordering. The review needs the electrical specifications, mounting requirements, connectors and any network or commissioning conditions. Confirm equipment acceptance and purchasing responsibilities in the proposal.
Can we keep the business operating during installation?
Discuss the work areas and shutdown requirements during the site review. Parking bays may need temporary closure, and work on existing distribution equipment can require a planned outage. Identify affected tenants, deliveries and operating hours before agreeing on the schedule.
Can we begin with a few ports and add more later?
Yes, expansion can be considered during the first installation. Identify likely future parking locations so conduit routes and space for equipment can be assessed. Additional chargers will still require a review of the building’s loads and available supply when that phase proceeds.
Which permits will the project need?
The answer depends on the property’s jurisdiction and the proposed work. Electrical installation, excavation and parking alterations can involve different approvals. The proposal should identify responsibility for obtaining applicable permits and arranging inspections.
Request a Quote for Your Wisconsin Property
To start the conversation, send the property address, proposed charging spaces and vehicle count. Parking sketches, electrical drawings and a recent utility bill are useful if available. Include the vehicle-delivery date or other deadline the project must meet.
Roman Electric reviews the requirements, arranges a walkthrough or design consultation and prepares a written proposal.